Alexandria (EGY) | Construction of a hybrid filter system

UGN® hybrid filter module 2500
Service Provider
Project
Location of performance / Site: El Sadat City, Menofia Governorate, Egypt, Africa
Period: 2025
Description

Task:

  • Construction of an exhaust air purification system at a lifting station

Solution:

  • UGN® hybrid filter module 2500
  • 6 m³ UgnCleanPellets® S 3.5
aus industriellen Prozessen und abwassertechnischen Anlagen
Volume flow: 550 m³/h
Average pollutant concentration: 50 ppm H2S
Pollutant concentration (peak load): 100 ppm H2S
Filter material: UgnCleanPellets® S 3.5
Client
A company from Ägypten
Share Reference

More references by UGN-Umwelttechnik GmbH

Invite to Beta