| Location of performance / Site: | Boizenburg/Elbe, Mecklenburg-Western Pomerania, Germany, Europe |
|---|---|
| Date: | 2016 |
Task:
System parameters:
Solution:
| Pollutant degradation: | Hydrogen sulfide |
|---|---|
| Volume flow: | 60 Nm³/h |
| Pollutant concentration: | 100 ppm H2S |
| Filter material: | UgnCleanPellets® S 3.5 |