| Location of performance / Site: | Pfahlheim, Ellwangen (Jagst), Baden-Wuerttemberg, Germany, Europe |
|---|---|
| Execution time since: | 2015 |
Task:
System parameters:
Solution:
| Pollutant degradation: | Hydrogen sulfide |
|---|---|
| Volume flow: | 250 Nm³/h |
| Pollutant concentration: | 1,000 ppm H2S |
| Filter material: | UgnCleanPellets® S 3.5 |