| Location of performance / Site: | Erlau, Saxony, Germany, Europe |
|---|---|
| Period: | Jul - Nov 2020 |
The order was placed in July 2020 with a project processing time of 5 months until commissioning in November. The tank production, the assembly and assembly of the valve cabinet as well as all the installation components were carried out by the company UGN and the electrical installation/control technology by the company MT Bachmann. The system was equipped with sprinkler, automatic condensate discharge or water re-feed, air dosing (basic load) and heating with stainless steel pipe coil.
| Pollutant degradation: | Hydrogen sulfide |
|---|---|
| Volume flow: | 225 Nm³/h |
| Pollutant concentration: | 500 ppm H2S |
| Filter material: | UgnCleanPellets® S 3.5 |