| Location of performance / Site: | Meckelstedt, Geestland, Lower Saxony, Germany, Europe |
|---|---|
| Period: | Jul - Oct 2020 |
The commissioning of the project was carried out in July 2020 by Sauter Biogas GmbH and was realized in 3 months. The container production and assembly of all attachment components was carried out by the company UGN. It is a single biogas filter module without valve cabinet and switch cabinet (no electrical components). The filter module must be connected to the on-site freshwater and condensate media independently. The commissioning is also carried out independently.
| Pollutant degradation: | Hydrogen sulfide |
|---|---|
| Volume flow: | 50 Nm³/h |
| Pollutant concentration: | 500 ppm H2S |
| Filter material: | UgnCleanPellets® S 3.5 |