| Location of performance / Site: | Pfeffenhausen, Bavaria, Germany, Europe |
|---|---|
| Period: | 2017 - 2018 |
Task:
System parameters:
Solution:
Commissioning of the first BEKOM H in 2017
Extending by a second gas desulphurisation system in 2018
| Pollutant degradation: | Hydrogen sulfide |
|---|---|
| Volume flow: | 300 Nm³/h |
| Pollutant concentration: | 300 ppm H2S |
| Filter material: | UgnCleanPellets® S 3.5 BIO |